The unofficial end of summer has arrived, and millions of Americans are expected to hit the roads for one last getaway this Labor Day weekend. With heavy traffic and major highway bottlenecks expected across New York, transportation officials are urging weekend travelers to skip the gridlock and take public transit when possible.
However, major holiday maintenance work will trigger significant service interruptions across nearly a dozen subway lines. To ensure you aren’t stranded on a platform when you should be poolside, here’s your ultimate line-by-line breakdown and schedule guide.
⚡ Quick Summary: Core Holiday Rules
- Labor Day (Monday, September 7): Subways, MTA buses, LIRR, and Metro-North will operate on a Sunday schedule
- Suspended Lines on Monday: B, W, and Z trains will not run on Labor Day
- Major Trackwork Closures: Extensive track replacements will halt or re-route service on the 1, 4, 5, A, and J lines

🚇 Line-by-Line Subway Service Disruptions
Plan ahead for major maintenance work taking place from Friday night through Tuesday morning:
🔴 1, 4, 5, 6 Lines (IRTT Routes)
- 1 Train: No service between 137 St-City College and 168 St (Fri 11:45 pm – Tue 5 am). Free shuttle buses will connect stations, or passengers can transfer to the A/C at nearby stops
- 4 Train: No service between 149 St-Hostos and 125 St (Fri 11:45 pm – Tue 5 am). Free shuttle buses will run. Metro-North will cross-honor 4 train riders at no extra charge between Manhattan and the Bronx. Runs local in Manhattan (125 St to Brooklyn Bridge) Sat–Mon
- 5 Train: No service between Bowling Green (Manhattan) and East 180 St (Bronx) Sat–Mon. Use the 2 or 4 trains instead
- 6 Train: Trains will run every 8 minutes throughout the daytime and evening hours Sat–Mon
🔵 A, C, Rockaway Lines
- A Train (Queens): No service between Rockaway Blvd and Ozone Park-Lefferts Blvd (Sat 12:30 am – Mon 10 pm). Lefferts-bound trains re-routed to Rockaway Park-Beach 116 St
- A & C Trains (Manhattan): Downtown A and C trains will run local, skipping 116, 110, 103, 96, 86, 81, and 72 Sts (Fri – Tue overnight for A; Sat – Mon all day for C)
- Rockaway Park Shuttle: Replaced directly by the A train during days and evenings Sat–Mon
🟧 F, G, J, Z Lines
- F Train: Coney Island-bound F trains run express in Brooklyn from Smith-9 Sts to Kings Highway (Fri 10:45 pm – Tue 5 am)
- G Train: Church Av-bound G trains skip 4 Av-9 St, 15 St-Prospect Park, and Fort Hamilton Pkwy (Fri 10:45 pm – Tue 5 am)
- J Train: No service between Crescent St and Broadway Junction (Sat 3:45 am – Sun 10 pm). Free shuttle buses will bridge the gap

🚆 Staten Island Railway
- Trains will run every 45 minutes between St. George and Tottenville (Sat 1:15 am – Mon 4 am)
🚍 New York City Buses
- Monday, September 7: MTA buses will operate on a Sunday schedule (note: some routes do not operate on Sundays or do not run on part of the route at certain hours). Express bus options will be severely reduced or non-operational
🚆 Commuter Rails: LIRR & Metro-North
Long Island Rail Road (LIRR)
- Saturday, September 5 & Sunday, September 6: The Long Island Rail Road will operate on a Saturday schedule
- Monday, September 7: LIRR trains will operate on a weekend/holiday schedule
- Montauk Branch trains will run on a Sunday schedule
- The 5:13 pm train from Penn Station to Montauk will run year-round beginning September 8, 2026, giving riders a permanent one seat ride from New York City to the East End

Metro-North Railroad
Throughout Labor Day Weekend there will be service adjustments on both the East and West of Hudson Lines.
- East of Hudson:
- Friday, September 4: Extra getaway trains will operate on Metro-North’s three East of Hudson lines
- Saturday, September 5: East of Hudson lines will operate a normal Saturday schedule
- Sunday, September 6 & Monday, September 7: East of Hudson lines will operate a Sunday schedule
- Tuesday, September 8: Normal weekday service resumes
- West of Hudson – Port Jervis Line:
- Friday, September 4:
- The 2:41 pm train from Hoboken Terminal to Middletown, NY will be extended to Port Jervis, making stops at Otisville and Port Jervis
- The 6:14 pm train from Hoboken Terminal to Port Jervis will not operate
- Monday, September 7: An extra train departs Port Jervis at 4:05 pm, making all stops through Suffern, then express to Secaucus Junction and Hoboken, arriving at Hoboken at 6:24 pm, with a connecting train at Secaucus Junction to New York Penn Station arriving in New York at 6:33 pm
- Friday, September 4:

🚗 MTA Bridges & Tunnels
- Thursday, September 3 – Tuesday, September 8: Daytime scheduled construction or maintenance requiring lane closures will be suspended beginning at 1 pm on Thursday through 6 am on Tuesday
Critical roadwork may be permitted during overnight hours at times when traffic permits. Maximum roadway availability will be maintained during times of peak travel.
⁉️ How to Stay in the Loop
The MTA offers customers a variety of ways to receive real-time and planned service change information, including:
- mta.info – the definitive source for real-time arrivals and the Service Status lookup tool
- MTA app – perfect for chatting with customer service if you get stuck
- TrainTime app – essential for LIRR and Metro-North riders to buy tickets and track GPS train locations
- Email & Text Alerts – alerts tailored to their specific commutes and travel times–customers can sign up here
- 511 – information is available by dialing 511
Happy (and smooth!) travels, New York!